What we measure
The price per watt peak (€/Wp) of new solar modules, excluding VAT, as offered or agreed between businesses. For Europe this is the price delivered duty paid to an EU address. Other regions use their own local basis (see below) and are converted to euro.
Each value has three parts: mid (the typical accepted offer), and low and high (the lower and upper end of the bulk of accepted offers). Next to each value we show n, the number of accepted offers behind it.
Changes (1d, 7d, 30d, 90d) compare today's mid with the mid 1, 7, 30 and 90 days earlier.
Two indexes
Offer prices and executed-deal prices are separate indexes. An offer is a price a seller is willing to transact at. An executed deal is a price that was actually agreed. They are not averaged together, and a chart of one is not labelled as the other.
The weekly charts on the home page are published market prints. They are not either index. A ladder price, once the sample rule is met, comes from offers or from deals, and the label says which.
Normalisation
Before two prices can sit in the same cell they are put on the same footing. Delivery basis (for example delivered duty paid, or free on board) is recorded and not mixed. Volume is the trade size the price applies to, not a single module. Terms cover what is included, such as VAT, which is excluded. Timing is when the price was valid, not when we happened to see it. A price that cannot be placed on those four points does not enter the cell.
Calculation and revisions
A value is shown only when at least five accepted listings come from at least three sellers. Below that the cell says “collecting data”. We do not publish the weights or the exact formula. A revision replaces a value only with a dated correction. The previous value stays visible as what was published that day. We do not silently overwrite a past day, and we do not fill a missing day with an estimate.
Categories
Each offer is placed in exactly one category from its datasheet.
- TOPCon mainstream
- n-type TOPCon, glass-glass or glass-backsheet, module efficiency up to 23.5 %, standard frame colour.
- TOPCon high-efficiency
- n-type TOPCon above 23.5 % module efficiency or 620 Wp and up in the 2382 x 1134 mm class.
- HJT
- Heterojunction modules of any power class, mono- or bifacial.
- Back contact (BC)
- Back-contact cell modules other than the residential all-black build, including black-frame and glass-glass versions.
- BC All Black
- Back-contact modules with a black frame and a black back, the residential all-black BC print. A black frame on another cell technology is not this category.
- Low Cost
- B-grade, end-of-line, older p-type stock and insolvency stock with full documentation.
Technology ladder
The home page orders module builds from the newest back-contact designs down to older crystalline stock, and then thin film on its own line. Each build is split into a residential size class (about 400–500 W, 108 half-cut cells) and a utility size class (about 580 W and up, 132 or 144 half-cut cells).
A ladder price is printed only when at least five listings come from at least three sellers for that build and size. Otherwise the cell says “collecting data”. We do not invent a price, an offer count, or a size. Twelve builds run from BC All Black down to thin-film CdTe and lightweight crystalline modules. A watchlist sits under the ladder for technologies that are not yet priced.
The comparison table next to the ladder is a set of typical datasheet ranges, with its own date, and it is not the weekly price series. Module pictures are not part of this public page.
Efficiency records
The efficiency leaderboard is separate from the price series. Lab cells and modules come from the Green et al. solar cell efficiency tables (version 68) and the NREL/NLR chart. A newer record is listed only when the announcement names the certifying lab, and it is marked as a press release with the last value those tables list. Commercial rows are the top bin on a current manufacturer datasheet. Drafts, pre-production claims and results we could not trace are left out.
Regions and price basis
- EU DDP
- EUR/Wp excl. VAT, delivered duty paid to an EU address · EUR.
- UK
- Converted to EUR/Wp at the ECB reference rate, delivered in the UK, excl. VAT · GBP.
- US
- Converted to EUR/Wp at the ECB reference rate, DDP, duties included · USD.
- Latin America
- Converted to EUR/Wp at the ECB reference rate, local delivery basis, excl. VAT · USD.
- Africa
- Converted to EUR/Wp at the ECB reference rate, local delivery basis, excl. VAT · USD.
- Middle East
- Converted to EUR/Wp at the ECB reference rate, local delivery basis, excl. VAT · USD.
- Pakistan
- Converted to EUR/Wp at the ECB reference rate, excl. local VAT · PKR.
- India
- Converted to EUR/Wp at the ECB reference rate, excl. GST · INR.
- China domestic
- Converted to EUR/Wp at the ECB reference rate, excl. VAT · CNY.
- Export FOB
- Converted to EUR/Wp at the ECB reference rate, free on board · USD · not a place on the map.
- Japan/Korea
- Converted to EUR/Wp at the ECB reference rate, local delivery basis, excl. VAT · JPY.
- Southeast Asia
- Converted to EUR/Wp at the ECB reference rate, local delivery basis, excl. VAT · USD.
- Australia
- Converted to EUR/Wp at the ECB reference rate, local delivery basis, excl. GST · AUD.
Currency conversion uses the European Central Bank daily reference rate.
Recent published prices
The main chart on the home page is a weekly series for the last three months, in €/Wp. It is published market data, converted with the European Central Bank reference rate of each print’s date. A move in euro can come from the exchange rate when the published dollar or yuan print is unchanged.
A week with no print is left blank. We do not fill a gap with an estimate or with the previous week’s number. This series is not the PV Price Index. The daily index, once live, will be a separate series built from offers and confirmed deals.
Outlook and policy
The outlook on the home page is our view, with a date on it. It is not a data series and it is not a single forecast number. It is written from the published weekly record and from policy, trade and factory events we can date.
The policy tracker lists real subsidy, tariff and manufacturing decisions, each with a date, a status (planned, active, ending, cut or cancelled) and the effect we expect on demand or supply. It is a short list, not a complete register, and it is not the method of the daily index.
A supply-and-demand panel will sit next to these once we have a consistent, dated public series for production and installations. Until then that panel stays empty. We do not sketch figures we cannot stand behind.
Long history
The long-run chart on the home page is a yearly module price from 2006 to 2025, in 2025 USD/W. The dollars are inflation-adjusted (constant 2025 dollars). We do not convert that series into €/Wp, and it is not the PV Price Index.
Through 2009 each point is a global estimate. In 2010 the source switches to IRENA’s European benchmark. The chart marks that year with a source-switch line. A step there is a change of what is being measured, not a price move in our index.
Those yearly figures are public data. The attribution, which also sits under the chart, is: IRENA (2025, 2026); Nemet (2009); Farmer & Lafond (2016) – with major processing by Our World in Data (CC BY 4.0). It is their series, with their processing. It is not our data.
There is no verified yearly value after 2025, and the chart stops there. We do not extend it with an estimate or with a currency conversion. The daily PV Price Index will be a separate series, in €/Wp excl. VAT.
Kinds of sources
- Verified marketplace offers. Public B2B offers with a stated price, quantity and product. We check that the product and seller are real.
- Distributor price lists. Current trade price lists from distributors and wholesalers.
- Real transaction quotes from the PVDIS network. Quotes and confirmed deals shared with us by installers, distributors and manufacturers, anonymised before they enter the index.
The daily index will be built from offers and confirmed deals, not copied from another price index. A separate chart on the home page shows weekly published market prices, clearly labelled as such, and is not the PV Price Index.
Update schedule
Once live, the index will update every day at 06:00 CET, including weekends. Each value uses offers that were valid in the recent past. Older offers drop out automatically. A weekly email will summarise the last seven daily values.
Quality checks
- Normalise. Every offer is turned into €/Wp excl. VAT on the region's price basis.
- Remove duplicates. The same offer seen in two places counts once.
- Remove outliers. A statistical filter removes offers far away from the typical price for that day, for example a typo, a single pallet clearance or a mislabelled product.
- Check the sample. If too few offers remain, we show “Not enough data”. We never fill a gap with an estimate or yesterday's number.
Minimum sample
At least 5 accepted offers from at least 3 independent sources, for every value, every day.
Below that, the cell reads “Not enough data” and shows how many offers we did see. No single source, including PVDIS, can set a value on its own.
What we do not publish
We do not publish the list of sources, their weights, the exact formulas or how we collect offers. If those were public, a seller could move the index with a few planted offers, and the companies who share real quotes with us would be exposed. An independent reviewer can check the full method under NDA on request.
Independence
PVDIS (AUROWE UAB) participates in the market as a distributor. The index is run independently of that trading. PVDIS quotes are only one source among many, and they follow the same rules as every other source. No single seller, including PVDIS, can set a value on its own. Corrections are logged and shown on the day they apply.
Privacy
No tracking scripts and no advertising cookies. Email sign-up is not open yet, and this site collects no personal data. When sign-up opens it will need only your email, with one confirmation email first (double opt-in) and a one-click unsubscribe link in every email.